Technical: Engineering, Maintenance & HSE
ExMaC courses, seminars and programs give delegates the change to develop the wider skills and creativity that the modern workplace demands.
S.NO. |
PROGRAM TITLE |
DATE |
VENUE |
FEES US$ |
| IT1 | Troubleshooting Instrumentation & Control Systems | 23 – 27/1/2010 |
Cairo |
2990 |
|
| IT2 | Power System Operation | 23 – 27/1/2010 |
Cairo |
2990 |
|
| IT3 | Mechanical Properties of PWR Reactor Plant System Materials | 23 – 27/1/2010 |
Cairo |
2990 |
|
| IT4 | Operation & Maintenance of Valves in Water Networks | 24 – 28/1/2010 |
Abu Dhabi |
3200 |
|
| IT5 | Pump Troubleshooting | 24 – 28/1/2010 |
Abu Dhabi |
3200 |
|
| IT6 | Industrial Equipment Compressors, Pumps & Motors | 24 – 28/1/2010 |
Abu Dhabi |
3200 |
|
| IT7 | Reservoir Engineering & Management: Analysis, T Characterization, Simulation, Integration, Statistics & Naturally Fractured | 30/1 – 3/2/2010 |
Cairo |
2990 |
|
| IT8 | Uninterruptible Power Supply UPS) Selection, Installation, Maintenance & Operation | 30/1 – 3/2/2010 |
Cairo |
2990 |
|
| IT9 | Pumps And Turbine Maintenance Reliability = Profitability |
31/1 – 4/2/2010 |
Abu Dhabi |
3200 |
|
| IT10 | Vibration Analysis | 6 – 10/2/2010 |
Cairo |
2990 |
|
| IT11 | Maintenance Improvement for Managers and Supervisors | 6 – 10/2/2010 |
Cairo |
2990 |
|
| IT12 | Power System Analysis Using PC | 6 – 10/2/2010 |
Cairo |
2990 |
|
| IT13 | Control & Safety Relief Valves: Operation, Selection & Troubleshooting | 7 – 11/2/2010 |
Abu Dhabi |
3200 |
|
| IT14 | Computized Condition Monitoring | 13 – 17/2/2010 |
Cairo |
2990 |
|
| IT15 | Shaft Alignment & Vibration Analysis | 13 – 17/2/2010 |
Cairo |
2990 |
|
| IT16 | Pumps & Pressurized Piping Systems Performance , Computer Selection & Application | 13 – 17/2/2010 |
Cairo |
2990 |
|
| IT17 | Power system grounding | 14 – 18/2/2010 |
Abu Dhabi |
3200 |
|
| IT18 | Industrial Boilers “Operation - Maintenance | 20 – 24/2/2010 |
Cairo |
2990 |
|
| IT19 | Sub-station Safety | 20 – 24/2/2010 |
Cairo |
2990 |
|
| IT20 | Safe Operation & Maintenance of Circuit Breakers and Switchgears | 20 – 24/2/2010 |
Cairo |
2990 |
|
| IT21 | The Advanced Rotating Equipment Troubleshooting | 21 – 25/2/2010 |
Abu Dhabi |
3200 |
|
| IT22 | Accident Investigation & Analysis for Safety, Health & Security Professionals Practical Techniques | 21 – 25/2/2010 |
Abu Dhabi |
3200 |
|
| IT23 | Handling Chemicals – Design For Safe Handling | 21 – 25/2/2010 |
Abu Dhabi |
3200 |
|
| IT24 | Advanced Process Control | 27/2 – 3/3/2010 |
Cairo |
2990 |
|
| IT25 | Process Reactors: OPERATION, TROUBLESHOOTING, START-UP & SHUTDOWN: Hydro-Treating, Catalytic Reforming & Hydro-Cracking | 27/2 – 3/3/2010 |
Cairo |
2990 |
|
| IT26 | Advanced Maintenance Management: Planning, Scheduling and Control | 28/2– 4/3/2010 |
Abu Dhabi |
3200 |
|
| IT27 | Power System Reliability | 28/2– 4/3/2010 |
Abu Dhabi |
3200 |
|
| IT28 | Pressure Vessel Integrity through Design Operation Maintenance | 28/2– 4/3/2010 |
Abu Dhabi |
3200 |
|
| IT29 | Distribution System Planning in Electrical Network | 6 – 10/3/2010 |
Cairo |
2990 |
|
| IT30 | Root Cause Failure Analysis (RCFA): Methods and Techniques | 6 – 10/3/2010 |
Cairo |
2990 |
|
| IT31 | HSE Audit & Site Inspection | 6 – 10/3/2010 |
Cairo |
2990 |
|
| IT32 | Heat Exchangers: Shell and Tube Heat Exchangers Design, Operation, Control and Troubleshooting | 7– 11/3/2010 |
Abu Dhabi |
3200 |
|
| IT33 | Pumps Testing & Performance Curve Using PC | 13 – 17/2/2010 |
Cairo |
2990 |
|
| IT34 | Computer Management Maintenance Systems ( CMMS ) |
13 – 17/2/2010 |
Cairo |
2990 |
|
| IT35 | FIDIC Construction Contracts | 13 – 17/2/2010 |
Cairo |
2990 |
|
| IT36 | Heat Exchangers: Shell And Tube Heat Exchangers Design, Operation, Control And Troubleshooting | 14 – 18/2/2010 |
Abu Dhabi |
3200 |
|
| IT37 | Maintenance Management Best Practices: Systems, Tools & Techniques | 14 – 18/2/2010 |
Abu Dhabi |
3200 |
|
| IT38 | Protective Relaying and Equipment Protection | 14 – 18/2/2010 |
Abu Dhabi |
3200 |
|
| IT39 | Power Transformers Design Manufacture Testing Operation & Maintenance | 20– 24/3/2010 |
Cairo |
2990 |
|
| IT40 | Electrical, Control & Instrumentation Engineering | 20– 24/3/2010 |
Cairo |
2990 |
|
| IT41 | Maintenance Planning, Scheduling & Work Control | 21 – 25/3/2010 |
Abu Dhabi |
3200 |
|
| IT42 | Fleet Planning, Maintenance And Management | 21 – 25/3/2010 |
Abu Dhabi |
3200 |
|
| IT43 | Piping & valves: Design, Construction Operation & Integrity | 27 – 31/3/2010 |
Cairo |
2990 |
|
| IT44 | Maintenance Technology Best Practices: Inspection, Analysis & Monitoring | 27 – 31/3/2010 |
Cairo |
2990 |
|
| IT45 | Control Safety Relief Valves; Operation, Selection & Troubleshooting | 27 – 31/3/2010 |
Cairo |
2990 |
|
| IT46 | Electrical Power Systems Quality & Troubleshooting | 27 – 31/3/2010 |
Cairo |
2990 |
|
| IT47 | Reactive Power Management and Power Factor Correction : | 27 – 31/3/2010 |
Cairo |
2990 |
|
| IT48 | Design, Operation & Maintenance of Water Networks Pipelines | 27/2 – 3/3/2010 |
Cairo |
2990 |
|
| IT49 | Liquid & Gas Flow metering | 27/2 – 3/3/2010 |
Cairo |
2990 |
|
| IT50 | Electrical Maintenance and Inspection | 28/3 – 1/4/2010 |
Abu Dhabi |
3200 |
|
| IT51 | Fundamentals of Process Control & Instrumentation | 28/3 – 1/4/2010 |
Abu Dhabi |
3200 |
|
| IT52 | Power System: Computerized Protection, Automation, Economic Operation & Load Dispatch | 3 – 7/4/2010 |
Cairo |
2990 |
|
| IT53 | Construction Site Management & Project Administration | 3 – 7/4/2010 |
Cairo |
2990 |
|
| IT54 | Condition Monitoring & Vibration Control of Machines Plants | 3 – 7/4/2010 |
Cairo |
2990 |
|
| IT55 | Piping Design, Construction And Mechanical Integrity | 3 – 7/4/2010 |
Cairo |
2990 |
|
| IT56 | Electrical Safety for Non Electricians | 4 – 8/4/2010 |
Abu Dhabi |
3200 |
|
| IT57 | Maintenance Management & Technology - A to Z of Best Practices ™ | 4 – 8/4/2010 |
Abu Dhabi |
3200 |
|
| IT58 | Pipeline Design & Fabrication | 10 – 14/4/2010 |
Cairo |
2990 |
|
| IT59 | Cathodic Protection- Theory, Design Installation, Commissioning and Trouble Shooting | 10 – 14/4/2010 |
Cairo |
2990 |
|
| IT60 | Mechanical Aspects of Centrifugal Compressor | 10 – 14/4/2010 |
Cairo |
2990 |
|
| IT61 | Corrosion in the Petrochemical Industry | 10 – 14/4/2010 |
Cairo |
2990 |
|
| IT62 | Mechanical Aspects of Centrifugal Compressor | 11 – 15/4/2010 |
Dubai |
3200 |
|
| IT63 | Centrifugal Compressor and steam Turbines – DESIGN, OPERATION & MAINTENANCE | 11 – 15/4/2010 |
Abu Dhabi |
3200 |
|
| IT64 | Mechanical & Design Engineering | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT65 | Design Of Electrical Distribution System Using Computers | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT66 | Pumps & Presusurized Piping Systems Performance , Computer Selection & Application | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT67 | Advanced Process Control & Loop Tuning | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT68 | LV/MV/HV Circuit breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT69 | HV and LV Power System Protection | 17 – 21/4/2010 |
Cairo |
2990 |
|
| IT70 | Maintenance Improvement for Managers and Supervisors | 18 – 22/4/2010 |
Abu Dhabi |
3200 |
|
| IT71 | HV & LV Switchgear | 18 – 22/4/2010 |
Abu Dhabi |
3200 |
|
| IT72 | Turbo – Generator Power Plants (Operation & Control | 24– 28/4/2010 |
Cairo |
2990 |
|
| IT73 | Safe Handling, Operation & Maintenance of Electrical Equipment in Hazardous Areas & Classification | 24– 28/4/2010 |
Cairo |
2990 |
|
| IT74 | Operation & Maintenance of Pumps in Water Networks | 24– 28/4/2010 |
Cairo |
2990 |
|
| IT75 | Machinery Bearing Lubrication & Reliability (Tribology) | 24– 28/4/2010 |
Cairo |
2990 |
|
| IT76 | Electrical Maintaining Commissioning & Troubleshooting | 25 – 29/4/2010 |
Abu Dhabi |
3200 |
|
| IT77 | Advanced Techniques for Effective Preventive & Predictive Maintenance | 25 – 29/4/2010 |
Abu Dhabi |
3200 |
|
| IT78 | Applying Statistical Process Control in the Laboratory | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT79 | Centrifugal Compressors & Turbines Design Operation | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT80 | High Voltage Operational Safety for Engineers & Technicians (OSHA, NFPA & EN Standards) | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT81 | Chemical & Hazmat Handling | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT82 | Pumps And Compressors: Design, Operation, Maintenance & Troubleshooting | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT83 | Electrical Power Systems Quality & Troubleshooting | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT84 | Laboratory Quality Management (ISO17025): SOP, Accreditation, Documentation and Auditing | 1 – 5/5/2010 |
Cairo |
2990 |
|
| IT85 | Preventive & Productive Maintenance for Overhead Lines | 2 – 6/5/2010 |
Abu Dhabi |
3200 |
|
| IT86 | Advanced Gas Chromatography Techniques & Troubleshooting | 2 – 6/5/2010 |
Abu Dhabi |
3200 |
|
| IT87 | Power Generation Commissioning Operations Maintenance | 2 – 6/5/2010 |
Dubai |
3200 |
|
| IT88 | Electrical Maintenance and Inspection | 2 – 6/5/2010 |
Abu Dhabi |
3200 |
|
| IT89 | Process Control & Instrumentation | 8 – 12/5/2010 |
Cairo |
2990 |
|
| IT90 | Computerized Maintenance Management Systems CMMS Answer or a Tool? | 8 – 12/5/2010 |
Cairo |
2900 |
|
| IT91 | Heat Exchangers: Shell And Tube Heat Exchangers Design, Operation, Control And Troubleshooting | 8 – 12/5/2010 |
Cairo |
2990 |
|
| IT92 | Switchgears & Circuit Breakers for Electrical Protection | 8 – 12/5/2010 |
Cairo |
3200 |
|
| IT93 | Periodical Maintenance for Buildings ( for Engineers & Technicians ) |
9 – 13/5/2010 |
Abu Dhabi |
3200 |
|
| IT94 | Switchgears & Circuit Breakers for Electrical Protection | 9 – 13/5/2010 |
Abu Dhabi |
2990 |
|
| IT95 | Construction Site Management & Supervision | 9 – 13/5/2010 |
Abu Dhabi |
3200 |
|
| IT96 | Cathodic Protection- Theory, Design Installation, Commissioning & Trouble Shooting | 15 – 19/5/2010 |
Cairo |
2990 |
|
| IT97 | Hazard Identification & Assessment: Qualitative and Quantitative Methods | 15 – 19/5/2010 |
Cairo |
2990 |
|
| IT98 | Selection Operation & Maintenance of Valves | 15 – 19/5/2010 |
Cairo |
2990 |
|
| IT99 | Maintenance Technology Best practices: Inspection, Analysis & Monitoring | 15 – 19/5/2010 |
Cairo |
2990 |
|
| IT100 | Control & Safety Relief Valves, Selection Operation & Troubleshooting | 15 – 19/5/2010 |
Cairo |
2990 |
|
| IT101 | Transportation & Road Infrastructure Management & Life Cycle Cost Analysis | 16 – 20/5/2010 |
Abu Dhabi |
3200 |
|
| IT102 | Reaction Power Management & Power Factor Improvement | 16 – 20/5/2010 |
Abu Dhabi |
3200 |
|
| IT103 | Mechanical Equipment: Control Valves, Actuators & Pumps Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance | 22 – 26/5/2010 |
Cairo |
2990 |
|
| IT104 | Fault Finding in Electrical Circuit & Equipment | 22 – 26/5/2010 |
Cairo |
2990 |
|
| IT105 | Measuring Instruments Monitoring & Calibration | 22 – 26/5/2010 |
Cairo |
2990 |
|
| IT106 | Gas Turbine Mechanical Maintenance | 22 – 26/5/2010 |
Cairo |
2990 |
|
| IT107 | Plant Reliability Centered Maintenance (RCM) | 23 – 27/5/2010 |
Dubai |
3200 |
|
| IT108 | Power Electronics: Devices, Control, Applications, Maintenance & Testing | 23 – 27/5/2010 |
Abu Dhabi |
3200 |
|
| IT109 | Computerized Maintenance Management Systems CMMS Answer or a Tool? | 29/5 – 2/6/2010 |
Cairo |
2990 |
|
| IT110 | Construction Site Management & Supervision – Advanced Techniques | 29/5 – 2/6/2010 |
Cairo |
2990 |
|
| IT111 | Rewinding & Maintenance of Electric Motors & Generator Alternator | 29/5 – 2/6/2010 |
Cairo |
2990 |
|
| IT112 | Mechanical Aspects of Centrifugal Compressor | 29/5 – 2/6/2010 |
Cairo |
2990 |
|
| IT113 | Machinery Vibration Monitoring & Analysis | 30/5 – 3/6/2010 |
Dubai |
3200 |
|
| IT114 | The Advanced Rotating Equipment Troubleshooting | 30/5 – 3/6/2010 |
Abu Dhabi |
3200 |
|
| IT115 | Electrical Equipment & Control Systems; Commissioning, Testing & Start up of Electrical Systems | 5 – 9/6/2010 |
Cairo |
2990 |
|
| IT116 | Natural Gas Processing, Gas Sweetening & Sulphur Recovery | 5 – 9/6/2010 |
Cairo |
2990 |
|
| IT117 | Generators: Operations, Maintenance, Control, Testing and Troubleshooting | 5 – 9/6/2010 |
Cairo |
2990 |
|
| IT118 | Steam Turbines Operation & Maintenance | 5 – 9/6/2010 |
Cairo |
2990 |
|
| IT119 | Pumps & Presusurized Piping Systems Performance , Computer Selection & Application | 5 – 9/6/2010 |
Cairo |
2990 |
|
| IT120 | Turbo – Generator Power Plants (Operation and Control) |
5 – 9/6/2010 |
Cairo |
2990 |
|
| IT121 | Accident Analysis Investigations and Reporting | 6 – 10/6/2010 |
Abu Dhabi |
3200 |
|
| IT122 | Industrial Equipment: COMPRESSORS, PUMPS, MOTORS and VARIABLE-SPEED DRIVES: Selection, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance | 6 – 10/6/2010 |
Abu Dhabi |
3200 |
|
| IT123 | Piping Fitness for Service, Pressure Vessel FFS for Inspectors | 6 – 10/6/2010 |
Abu Dhabi |
3200 |
|
| IT124 | Practical Machinery Vibration Monitoring, Analysis & Predictive Maintenance | 6 – 10/6/2010 |
Abu Dhabi |
3200 |
|
| IT125 | Basic Process Control | 12 – 16/6/2010 |
Cairo |
2990 |
|
| IT126 | Emergency Shutdown & Operations; Applied Technology & Procedures | 12 – 16/6/2010 |
Cairo |
2990 |
|
| IT127 | Installation & Troubleshooting of MV Overhead Distribution Lines | 12 – 16/6/2010 |
Cairo |
2990 |
|
| IT128 | Electrical Metering Applications, Maintenance &New Technologies | 12 – 16/6/2010 |
Cairo |
2990 |
|
| IT129 | Refinery operations Troubleshooting | 12 – 16/6/2010 |
Cairo |
2990 |
|
| IT130 | Heat Exchangers: Shell And Tube Heat Exchangers Design, Operation, Control And Troubleshooting | 13 – 17/6/2010 |
Abu Dhabi |
3200 |
|
| IT131 | Machinery Failure Analysis & Prevention | 13 – 17/6/2010 |
Abu Dhabi |
3200 |
|
| IT132 |
|
13 – 17/6/2010 |
Dubai |
3200 |
|
| IT133 | Safe Handling, Operation & Maintenance of Electrical Equipment | 13 – 17/6/2010 |
Dubai |
3200 |
|
| IT134 | Distribution System Planning in Electrical Network | 19 – 23/6/2010 |
Cairo |
2990 |
|
| IT135 | Reliability, Availability, Maintainability Study (RAM) | 19 – 23/6/2010 |
Cairo |
2990 |
|
| IT136 |
|
19 – 23/6/2010 |
Cairo |
2990 |
|
| IT137 | Advance Process Control Operation & Troubleshooting | 19 – 23/6/2010 |
Cairo |
2990 |
|
| IT138 | Industrial Equipment: COMPRESSORS, PUMPS, MOTORS & VARIABLE-SPEED DRIVES: Selection, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance | 19 – 23/6/2010 |
Cairo |
2990 |
|
| IT139 | Advanced Power Electronics: Technology & Applications | 19 – 23/6/2010 |
Cairo |
2990 |
|
| IT140 | Advance Power Generation & Distribution | 20 – 24/6/2010 |
Abu Dhabi |
3200 |
|
| IT141 | Power Transformers Design Manufacture Testing Operation & Maintenance | 20 – 24/6/2010 |
Abu Dhabi |
3200 |
|
| IT142 | Advanced Process Risk Assessment Management | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT143 | Installation, Calibration & Maintenance of Power Consumption Meters & telemeters | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT144 | Preventive & Productive Maintenance for Overhead Lines | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT145 | Electrical Maintenance, Testing, Inspection and Risk Assessment | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT146 | Rotating Equipment Predictive & Preventive Maintenance | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT147 | Fault Diagnosis of Pumps, Turbines & Compressor | 26 – 30/6/2010 |
Cairo |
2990 |
|
| IT148 | Maintenance & Reliability Management: Planning, Estimating, Scheduling & Control (Cost Effective Maintenance Management) | 27/6 – 1/7/2010 |
Dubai |
3200 |
|
| IT149 | Measuring Instruments Monitoring & Calibration | 27/6 – 1/7/2010 |
Dubai |
3200 |
|
| IT150 | Computerized Maintenance Management Systems CMMS Answer or a Tool? | 3 – 7/7/2010 |
Cairo |
2990 |
|
| IT151 | Electrical Power Distribution Planning & Control | 3 – 7/7/2010 |
Cairo |
2990 |
|
| IT152 | Road Pavement Projects Design, Construction & Maintenance | 3 – 7/7/2010 |
Cairo |
2990 |
|
| IT153 | Testing, Commissioning & Start-Up of Electrical & Control Systems | 3 – 7/7/2010 |
Cairo |
2990 |
|
| IT154 | Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives | 3 – 7/7/2010 |
Cairo |
2990 |
|
| IT155 |
|
3 – 7/7/2010 |
Cairo |
2990 |
|
| IT156 | Maintenance of Circuit Breakers &Transformers | 4 – 8/7/2010 |
Abu Dhabi |
3200 |
|
| IT157 | Mechanical Seals for Pumps & Compressors in Service | 4 – 8/7/2010 |
Abu Dhabi |
3200 |
|
| IT158 | Gear Boxes: Selection, Inspection, Maintenance, Troubleshooting & Repair | 4 – 8/7/2010 |
Dubai |
3200 |
|
| IT159 | Centrifugal Compressors & Operation & Maintenance | 4 – 8/7/2010 |
Abu Dhabi |
3200 |
|
| IT160 | Process Control & Instrumentation | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT161 | Power Distribution Systems: Planning & Performance | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT162 | Concrete Buildings Maintenance & Management | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT163 | Process Plant Troubleshooting & Engineering Problem Solving | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT164 | Troubleshooting Plant Rotating Equipment and Effective Predictive Maintenance | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT165 | Process Plant Start up & Commissioning | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT166 | Reliability, Availability & Maintainability (RAM) | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT167 | Integrated Contingency Planning for Industrial Emergencies (ICP) | 10 – 14/7/2010 |
Cairo |
2990 |
|
| IT168 | Circuit Breakers Operations & Maintenance | 11 – 15/7/2010 |
Abu Dhabi |
3200 |
|
| IT169 | Power Generation: Gas Turbines, Steam Power Plants, Co-Generation & Combines Cycle Plants: Selection, Applications, Operation, Maintenance & Economics | 17 – 28/7/2010 |
Cairo |
5500 |
|
| IT170 | Corrosion Inhibition Principles & Management | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT171 | Fire Risk Assessment, Safety & Emergency Planning | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT172 | Machinery Vibration Monitoring & Analysis | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT173 | Electric Distribution System Equipment Preventive Maintenance (EPM) and Engineering Principles | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT174 | Rotating Equipment Reliability Optimization & Continuous Improvement | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT175 | Implementing Best Practices in Multi-Shift Operations: Maximizing Productivity Through Round-The-Clock Operations | 17 – 21/7/2010 |
Cairo |
2990 |
|
| IT176 | Accident & Incident Investigation Analysis | 18 – 22/7/2010 |
Abu Dhabi |
3200 |
|
| IT177 | Practical Valve Technology: Selection, Operation, Maintenance & troubleshooting | 18 – 22/7/2010 |
Abu Dhabi |
3200 |
|
| IT178 | Safety Instrumentation System for Process Industry in Oil & Gas | 24 – 28/7/2010 |
Cairo |
2990 |
|
| IT179 | Maintenance Planning Scheduling & Work Control | 24 – 28/7/2010 |
Cairo |
2990 |
|
| IT180 | Pumps & Compressors Operation Maintenance & Troubleshooting | 24 – 28/7/2010 |
Cairo |
2990 |
|
| IT181 | Electrical Faults Causes Analysis Detection & Remedies | 24 – 28/7/2010 |
Cairo |
2990 |
|
| IT182 | Root Cause Failure Analysis & Reliability Improvement | 25 – 29/7/2010 |
Abu Dhabi |
3200 |
|
| IT183 | Maintenance Technology Best Practices: Inspection, Analysis & Monitoring | 31/7 – 4/8/2010 |
Cairo |
2990 |
|
| IT184 | The Advanced Rotating Equipment Troubleshooting | 31/7 – 4/8/2010 |
Cairo |
2990 |
|
| IT185 | Process Equipment Design for Refineries Petrochemical & Related Process Plants | 31/7 – 4/8/2010 |
Cairo |
2990 |
|
| IT186 | Practical Machinery Vibration Monitoring, Analysis & Predictive Maintenance | 31/7 – 4/8/2010 |
Cairo |
2990 |
|
| IT187 | Power System: Computerized Protection, Automation, Economic Operation & Load Dispatch | 31/7 – 4/8/2010 |
Cairo |
2990 |
|
| IT188 | Preventive Maintenance Planning Metrics & Benchmarking | 1 –5/8/2010 |
Abu Dhabi |
3200 |
|
| IT189 | Centrifugal Compressor & Steam Turbines Design, Operations and Maintenance | 1 –5/8/2010 |
Abu Dhabi |
3200 |
|
| IT190 | Pumps & Valves: Maintenance, Inspection & Troubleshooting | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT191 | Facilities Preventive & Predictive Maintenance Management Workshop | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT192 | Maintenance & Inspection of Utility Piping Network | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT193 | Chemical Engineering for Non-Chemical Engineers | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT194 | Value Engineering – Performance and Cost Optimization | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT195 | Practical Pump Technology: Selection, Operation and Maintenance | 25 – 29/9/2010 |
Cairo |
2990 |
|
| IT196 | Advanced Engineering Management & Maintenance Techniques | 26 – 30/8/2010 |
Abu Dhabi |
3200 |
|
| IT197 | Health & Safety Management in the Oil & Gas Industries (Best Practice) | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT198 | Pumps: Selection, Operation, Testing, Troubleshooting & Maintenance | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT199 | Metallurgy Corrosion & Prevention of Failures | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT200 | OSHA Standards for Safety, Loss Prevention, Fire & Protection Professionals | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT201 | Maintenance Support Design/Redesign (MSDR) | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT202 | Piping Design, Construction and Mechanical Integrity Training | 2 – 6/10/2010 |
Cairo |
2990 |
|
| IT203 | Preventive Maintenance of Electric Equipment | 3 – 6/10/2010 |
Abu Dhabi |
3200 |
|
| IT204 | Design & Selection of Air Conditioning Units (Practical Application) | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT205 | Rotating Equipment – Predictive & Preventive Maintenance | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT206 | Hazardous Area Classification & Intrinsic Safety | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT207 | LV & HV Switchgear Selection, Maintenance & Control | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT208 | Maintenance Management: Parts & Materials and Inventory Control Process Stages | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT209 | Industrial Equipment: Compressors, Pumps, Motors & Variable Speed Drive: Selection, Sizing, Application | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT210 | Advanced Process Risk Assessment & Risk Management | 9 – 13/10/2010 |
Cairo |
2990 |
|
| IT211 | Loss Prevention & Safe Working Practice | 10 – 14/10/2010 |
Abu Dhabi |
3200 |
|
| IT212 | Construction Tendering; Preparation, Submittal, Analysis & Award | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT213 | Planning, Design, & Performance of the Electric Power Distribution Systems | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT214 | Pipeline Pigging: Technical & Operational Aspects | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT215 | Advanced Techniques for Effective Preventive & Predictive Maintenance | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT216 | Machinery For Process Industry (Operation, Maintenance & Inspection of Rotating Machinery) | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT217 | Emergency Shutdown Procedures | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT218 | Gas Transmission & Distribution Piping Systems | 16 – 20/10/2010 |
Cairo |
2990 |
|
| IT219 | Operation & Maintenance of Steam Turbines | 17 – 21/10/2010 |
Abu Dhabi |
3200 |
|
| IT220 | Process Plant Start-Up, Commissioning & Troubleshooting | 17 – 21/10/2010 |
Abu Dhabi |
3200 |
|
| IT221 | Power System Protective Relaying | 17 – 21/10/2010 |
Abu Dhabi |
3200 |
|
| IT222 | Maintenance & Fault Finding of Central Air Conditioning Units and Chillers | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT223 | Mechanical Seals & Packing | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT224 | Centrifugal Compressor and steam Turbines – DESIGN, OPERATION & MAINTENANCE | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT225 | Measuring & Improving Power Plant Efficiency | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT226 | Advanced Valve Technology: Design, Selection, Installation, Applications, Sizing, Inspection, Maintenance & Troubleshooting | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT227 | CMMS Computerized Maintenance Systems- Advanced | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT228 | Advanced Technology of Pipeline Design, Construction & Mechanical Integrity | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT229 | Gas Processing, Treatment & Sulphur Recovery | 23 – 27/10/2010 |
Cairo |
2990 |
|
| IT230 | Heat Exchanger Design, Performance, Inspection Maintenance & Operation | 24 –28/10/2010 |
Abu Dhabi |
3200 |
|
| IT231 | Heat Exchanger Design, Performance, Inspection, Maintenance & Operation | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT232 | Hazard Identification, Risk & Control | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT233 | Pumps & Turbines Maintenance | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT234 | Advanced Mechanical Maintenance Planning Control & Implementation | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT235 | Preventive & Predictive Maintenance for Overhead Lines | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT236 | Troubleshooting Plant Rotating Equipment and Effective Predictive Maintenance | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT237 | Machinery Root Cause Failure Analysis | 30/10 – 3/11/2010 |
Cairo |
2990 |
|
| IT238 | Maintenance Planning, Control & Documentation | 31/10 – 4/11/2010 |
Abu Dhabi |
3200 |
|
| IT239 | Quantity Surveying for Engineering Projects | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT240 | Transformer Operation, Maintenance & Testing | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT241 | Bearings Selection & Troubleshooting | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT242 | Welding Metallurgy, technology & Inspection | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT243 | HVAC Performance Evaluation & Improvement of Reliability for Based Maintenance Systems | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT244 | Feeder Identification & Distribution Cables Tracing & Fault Location | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT245 | Reading & Interpretation of Mechanical Engineering Drawings | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT246 | Advanced Heating, Ventilation and Air-Conditioning Systems (HVAC): Design, Installation and Maintenance | 6 – 10/11/2010 |
Cairo |
2990 |
|
| IT247 | Hazard Identification & Assessment: Qualitative and Quantitative Methods | 27/11 – 1/12/2010 |
Cairo |
2990 |
|
| IT248 | Circuit Breakers Operations & Maintenance | 5 – 9/12/2010 |
Abu Dhabi |
3200 |
|
| IT249 | Design & Inspection Of Refractory Materials for Refineries, Power Generation & Petrochemical Plants | 11 – 15/12/2010 |
Cairo |
2990 |
|
| IT250 | Metallurgy, Corrosion & Prevention of Failures | 11 – 15/12/2010 |
Cairo |
2990 |
|
| IT251 | Power Transformers: Design, Manufacture, Testing, Operation & Maintenance | 11 – 15/12/2010 |
Cairo |
2990 |
|
| IT252 | Piping Vibration Analysis & Practical Engineering Solutions | 11 – 15/12/2010 |
Cairo |
2990 |
|
| IT253 | Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plants | 11 – 15/12/2010 |
Cairo |
2990 |
|
| IT254 | Preventive & Productive Maintenance for Overhead Lines | 12 – 16/12/2010 |
Abu Dhabi |
3200 |
|
| IT255 | Accident Investigation Procedures and Root Cause Analysis(RCA) | 12 – 16/12/2010 |
Abu Dhabi |
3200 |
|
| IT256 | Fault Analysis in Service Networks and Electric Industrial Networks | 12 – 16/12/2010 |
Abu Dhabi |
3200 |
|
| IT257 | Natural Gas Processing, Gas Sweetening & Sulphur Recovery | 18 – 22/12/2010 |
Cairo |
2990 |
|
| IT258 | Advanced Steel Structure Design, Construction & Inspection | 18 – 22/12/2010 |
Cairo |
2990 |
|
| IT259 | Cathodic Protection- Theory, Design Installation, Commissioning and Trouble Shooting | 18 – 22/12/2010 |
Cairo |
2990 |
|
| IT260 | The Advanced Rotating Equipment Troubleshooting | 19 – 23/12/2010 |
Abu Dhabi |
3200 |
|
| IT261 | Safety Management & Emergency Response | 19 – 23/12/2010 |
Abu Dhabi |
3200 |
|
| IT262 | Advanced Materials for Construction & Repair of Concrete Structures | 25 – 29/12/2010 |
Cairo |
2990 |
|
| IT263 | Process Plant Shutdown and Turn Around | 25 – 29/12/2010 |
Cairo |
2990 |
|
| IT264 | Thyrstor Applications in Power Distribution & Motor Speed Control | 25 – 29/12/2010 |
Cairo |
2990 |
|
| IT265 | Power System Operation | 25 – 29/12/2010 |
Cairo |
2990 |
|
| IT266 | Natural Gas Processing, Gas Sweetening & Sulphur Recovery | 26 – 30/12/2010 |
Abu Dhabi |
3200 |
|
| IT267 | Computerized Advances of Power System Analysis & Design | 26 – 30/12/2010 |
Abu Dhabi |
3200 |




